Elements of an optimal fiscal regime for Romania’s offshore sector

The investment cycle of an oil project is long-term – typically 25-30 years, or longer for offshore projects. In addition, offshore projects in particular require large upfront exploration capital investments. Also, the investment risk for offshore exploration activities is high, and the cost recovery timeframe can be over a decade.

The Gemasolar Thermosolar Plant: one step closer to energy storage of the future

Photovoltaic is a unique concept, if looked at how fast this technology has been growing. In the next decade, global demand could be significantly fueled by solar power. Today, just 0.5% of the electricity comes from photovoltaics worldwide. It may seem like a small number, but in 1998 this was 0.003% and if the trend continues, in 2028 it will grow to 50%. Therefore, by then half of the energy demand could come from solar-powered plants.

Things to watch in 2015’s energy

2015 will be the year of new gas transport projects, which are to connect at regional level the Southern Gas Corridor to Central Europe´s North South Corridor. Domestically, the Black Sea coast will have to be linked to the National Transport System.

Hurdles in the Path of Romanian Gas Market Liberalization

The 2018 calendar was supposed to bring a 3% increase in household gas prices as of 1 October 2014, as a first step towards timely liberalization. In light of the burden that would have thus fallen on households ahead of presidential elections held in December, the Government, through its Department of Energy, requested this delay.

Oil and Gas History – tradition and strategic opportunity

The history of the oil and gas industry has been and is an intrinsic part of the economic and social development of modern Romania. Also, Romania has the prospect that, by the end of the current decade, it will become a top producer of hydrocarbons at European level – especially natural gas.

The fairytale that wasn’t: the Iasi-Ungheni gas interconnector

The Iaşi-Ungheni interconnector is a 43 km long pipeline meant to transport up to 1.5 bcm of gas per year from Romania to the Republic of Moldova, under the Prut River that constitutes the border between the two countries. Construction works only took one year, but they followed three years of talks between the two parties. Costs reached a total of €26.4m, most of which was covered by Brussels and Bucharest.